Project service sequence

Dexion services that keep storage acceptance evidence visible

Service planning begins before the first upright reaches the bay. The team defines the operating baseline, pallet and SKU assumptions, WMS/WCS ownership, safe intervention path and the evidence required to resume picks after a fault.

Response objectives depend on installed scope, project geography, approved remote access, spare availability and safe site entry. They are documented for the quoted project rather than presented as a universal service guarantee.

Define the service boundary
Pallet rack service bay with diagnostics and protected maintenance access
Four bounded workstreams

Each Dexion service activity has an input, owner and closeout record

The overview below is a planning model. Final deliverables, attendance and response windows are confirmed in the commercial scope and responsibility matrix.

01

Flow and SKU review

Check order-line distributions, pallet payload, load center, aisle and fire clearances, duty cycle, replenishment and the conditions that create backlog at the pick face.

  • Input revision register
  • Assumption and sensitivity list
  • Open design decisions
02

Controls boundary

Map WMS, WCS or WES, PLC and station responsibilities. Define command, acknowledgment, timeout, alarm and restart behavior at every interface that touches pallet release.

  • Message and state matrix
  • Interface cycle target in seconds
  • Exception ownership
03

Acceptance preparation

Turn pick-rate and availability targets into scripts with dataset, test duration, instrumentation, exclusions and pass criteria. Separate machine cycles from end-to-end fulfillment results.

  • FAT and SAT scripts
  • Observed-versus-expected log
  • Issue disposition record
04

Operational handover

Prepare alarm triage, isolation, manual fallback, spare strategy and controlled restart steps. Train the roles that authorize access and return the racking system to production.

  • Role-based work instructions
  • Critical-spares basis
  • Restart evidence checklist
Brownfield racking commissioning during a controlled warehouse window
Scenario pattern / brownfield cutover

Protect the current shift while the new bay state is tested

A live building cannot be treated like an empty simulation. The cutover plan identifies the bays that can be isolated, the work permitted during each window and the conditions that return operations to the previous state. Inventory and location identity are reconciled before picks are released.

The review also distinguishes a recoverable local beam or shuttle fault from a condition that stops a shared buffer, network or control layer. This can reduce theoretical test speed, but it creates a more credible commissioning plan and a traceable fallback decision.

Environment
Active warehouse with controlled work windows
Method
Bay-by-bay test, state reconciliation and rollback rehearsal
Evidence
Access record, interface log, issue status and release authorization
Exception recovery test at a pallet pick face
Scenario pattern / exception recovery

Measure the path back to controlled pallet presentation

A throughput run under clean conditions cannot demonstrate how the system behaves when a destination is occupied, a pallet identity is missing or a confirmation arrives late. The script injects one defined condition, records which layer detects it and observes the action that clears or escalates it.

Recovery time is interpreted with the affected flow boundary. A machine-level reset, a bay closure and a facility-wide material-flow interruption are not equivalent events. The acceptance record states the start event, end event, exclusions and any manual actions so later comparisons use the same definition.

Trigger
Blocked bay, message timeout or invalid identity
Observation
Alarm propagation, bay state and physical load position
Closeout
Authorized restart and downstream inventory confirmation
Design rateSKU mix + peak window
FAT casesDisturbance scripts logged
SAT gatesInstalled geometry proven
Restart proofOwner + evidence checklist
Close the service loop

Request a Dexion service boundary review

Share the load profile, aisle constraints, interface owners and the acceptance evidence you expect before restart. Planning-range figures are assumptions until measured on site.