+1 (800) 555-0142 · [email protected] EN · Storage RFQ desk
Talk with the application desk

Contact Dexion about your storage flow

Share pallet dimensions, SKU velocity bands, peak order lines, interfaces and the site constraints that shape a workable racking concept. We will help organize the next measurement—not force an early machine label.

Address

Dexion application desk
Project coordination hub for global RFQs
Support by contracted project scope

Hours

Monday–Friday
08:00–17:00 local project time
Urgent site issues by arranged window

Map illustration of Dexion application desk and warehouse project regions
LinkedIn YouTube Application Notes
Before you write

What a useful Dexion brief usually includes

A short message can start the conversation, but a reviewable brief shortens the path to a credible concept. Describe the load unit in kilograms and millimeters, note the pallet or tote packaging style, and separate A/B/C SKU velocity bands if you already track them. State the peak order lines per hour with the shift length and whether the peak is a daily spike or a seasonal wave.

Add the systems that already own identity and work release—WMS, WCS, WES or PLC—and the handshake timeout you can tolerate. If fire aisles, temperature zones or brownfield cutover windows constrain the layout, write those limits explicitly. Planning-range figures from early workshops are not certified claims; mark them as assumptions until measured.

What we will not assume

Boundaries that keep the reply honest

Dexion will not invent a universal pick rate from a bay count alone. Inventory cube utilization depends on selectivity, fire and maintenance access, replenishment and exception recovery. System availability should be stated at machine and end-to-end levels with exclusions. Interface cycle time in seconds belongs in the controls matrix, not in a marketing line.

Do not send passwords, VPN credentials, payment-card data or other sensitive personal information through this form. If drawings, emulation logs or FAT/SAT scripts must be exchanged, ask for a secure channel in your message. Response timing depends on project geography, installed scope and the completeness of the inputs you provide.

  • Pallet payload, load center and usable locations by load class
  • Peak window with buffer occupancy assumptions
  • Manual fallback and maintenance access path
  • Acceptance evidence you expect before restart
Inquiry checklist

What helps the Dexion reply stay specific

  • Pallet payload, dimensions and packaging type
  • SKU count and velocity bands
  • Peak order lines per hour and shift length
  • WMS/WCS/PLC interfaces already in place
  • Fire aisle, temperature and cutover constraints

The modal inquiry is a compact dialog for quick capture. This contact page keeps address, hours, map context and the full checklist visible so operations, maintenance and controls can prepare one shared brief.

Send storage flow details

Please provide your name.
Please provide a valid email.
Please provide your company.
Please describe the application.
Consent is required to submit.