+1 (800) 555-0142 · [email protected] EN · Storage RFQ desk
Engineering accountability

About Dexion storage systems engineering

Dexion organizes pallet racking, dense storage and AS/RS decisions around named owners, testable assumptions and lifecycle gates. Planning references in brand configuration—such as a 1995 seed year, 31 years of experience range, 250+ headcount or 13 countries served—are generated-range values and must not be published as verified corporate facts without source review.

Trust comes from a traceable method: state the basis, expose the limitation, test the representative task and give unresolved items a named owner before handover. Product SKU planning references of 900+ describe catalog breadth for RFQ conversations, not an inventory commitment at every site. Documented capacity, safety inputs, service access and recovery planning remain visible from RFQ through SAT.

Dexion engineering team reviewing pallet rack interfaces
Responsibility matrix

Who owns each pallet handshake

Commands, confirmations, timeouts and restart authority are assigned before steel drawings freeze. The matrix separates detection from authorization. Centralized WCS/WES can provide one operational view; modular controls can isolate failures—Dexion records which architecture the project selected and why.

BoundaryDetectsConfirmsMay restart
WMS ↔ WCSOrder wave / putaway mission requestMission accepted with destination setWCS supervisor with WMS reconciliation
WCS ↔ PLCBay not ready / buffer blockedSensor and interlock stateControls engineer or named operator role
PLC ↔ EquipmentShuttle jam, E-stop, motor faultLocal HMI status wordMaintenance after lockout clearance
Pick / staging faceMissing identity / confirmation timeoutStation controller handshakeBay owner under safety procedure
Test and commissioning path

Evidence strengthens from model to installed bays

01

Concept & data contract

Lock load units, SKU/order profile, peak window, destinations and unknown fields that require sensitivity tests. Rack load rating, aisle width and beam deflection assumptions are written with units.

02

Emulation

Exercise pallet release timing, blocked destinations and lost confirms against PLC or WCS under a versioned signal dictionary. Digital twin or emulation cases are optional tools, not substitutes for site geometry.

03

FAT

Prove integrated software and equipment behavior under controlled conditions with agreed disturbance cases. Open deviations stay visible with owners and due dates.

04

SAT & handover

Validate installed geometry, actual loads, buffer starts and recovery procedures; close open items before ownership transfer. System availability is stated at subsystem and end-to-end levels with exclusions.

Service coverage

Support follows contracted project scope

Application, integration and documentation support are provided by project scope. The configuration lists a service network description of application, integration and documentation support—neither is a universal SLA nor a resident-service commitment across all geographies.

Frameworks such as EN 15635 inspection planning and functional safety performance level (PL) considerations may apply as engineering methods; they are not presented as held certificates for a specific model because the brand certifications list is empty.

Application engineering

Rate, accumulation, pallet affinity and pick-face reviews against the operating profile and SKU velocity bands.

Controls integration

Interface matrices, emulation cases and FAT protocols for WMS/WCS/PLC boundaries and fieldbus or OPC UA links where specified.

Commissioning windows

Brownfield cutover plans with fallback pick paths, rollback triggers and inventory reconciliation steps.

Lifecycle documentation

Isolation sequences, critical spares lists, mean time to repair assumptions and restart evidence at handover.

Acceptance evidence rail

Four gates Dexion keeps visible through handover

Design Rate

Pick rate and order lines per hour stated with SKU mix, peak window and buffer occupancy assumptions.

Request rate basis →
FAT

Controlled disturbance cases, observed-versus-expected log and open deviation owners before ship or site install.

Review FAT scope →
SAT

Installed geometry, actual loads and recovery procedures closed before ownership transfer.

Review SAT path →
Service Response

Access conditions, critical spares and restart evidence defined before system availability becomes contractual.

Open Roadmap →
Talk with application engineering

Ask Dexion to map owners before drawings freeze

Share the interfaces, load assumptions and acceptance gates you need to see before cutover. Generated-range planning figures remain labeled as planning references until verified.

Please provide your name.
Please provide a valid email.
Please provide your company.
Please describe the application.
Consent is required to submit.